Speed Car Retrospective Template: Engine, Parachute, Hazards and Bridges

Run a Speed Car retro in 30 minutes: engine, parachute, hazards and the bridge past them, with 12 prompts, an agenda and action items for faster delivery.

Retro Rabbit TeamUpdated
  • โœ“ No credit card
  • โœ“ CarrotIQ AI included in the trial
  • โœ“ Cancel anytime
On this page (10 sections)
  1. The four columns
  2. When to use it (and when not to)
  3. How to run it live (30 minutes)
  4. How to run it async over a sprint
  5. 12 example prompts
  6. Facilitator tip and a common pitfall
  7. How AI helps with this format
  8. Example action items
  9. Use this template in Retro Rabbit
  10. Related formats

The Speed Car retrospective treats the team as a race car. What speeds us up is the engine, what slows us down is the parachute, hazards on the road are the dangers ahead, and how we get past them is the bridge you build before you reach them. It's a 30-minute format for teams whose main question is delivery speed.

The four columns

ColumnWhat goes hereExample note
๐ŸŽ๏ธ What speeds us upWhat made work move fast: practices, tools, decisions"Contract tests let us ship the API without waiting for the mobile team."
๐Ÿช‚ What slows us downWhat dragged on delivery this sprint: waits, handoffs, queues"Design sign-off adds two to three days to every story."
๐Ÿ•ณ๏ธ Hazards on the roadDangers ahead that could stop or crash the team"App store review lands right before the holiday code freeze."
๐ŸŒ‰ How we get past themA bridge for a specific hazard: what you'll build or do first"Submit the iOS build a week before the freeze."

Every hazard needs a bridge. The fourth column is what sets Speed Car apart. A hazard without a bridge is just worry, so whoever adds a hazard also adds a bridge note.

Where it comes from. Paulo Caroli described it on his Agile Tips blog in July 2011 as the Speed Car โ€“ Abyss activity: an engine and a parachute for the sprint behind you, an abyss and a bridge for the road ahead. His version runs 40 minutes. Notes added during the sprint get it down to 30.

In Retro Rabbit

The Speed Car template in Retro Rabbit

Pick Speed Car from the format library when you create a Team Room (or later in its Settings) and the board starts with its four columns. Your team adds notes during the sprint, with or without their name shown, then votes on what to talk about.

Speed Car ยท Sprint #14

Example notes

What speeds us up

  • Contract tests let us ship the API without waiting for the mobile team2 votes
  • Pairing on the checkout bug fixed it in a day instead of a week4 votes

What slows us down

  • Design sign-off adds two to three days to every story5 votes
  • Every schema change waits up to two days for a DBA ticket3 votes

Hazards on the road

  • App store review lands right before the holiday code freeze3 votes
  • Partner API rate limit drops to 20 requests a second on January 12 votes

How we get past them

  • Submit the iOS build a week before the freeze1 vote
  • Batch partner API calls and add a retry queue before January1 vote
A Speed Car board with example notes, written for illustration.
  • What speeds us up
  • What slows us down
  • Hazards on the road
  • How we get past them
Use this template free

14-day free trial ยท No credit card

When to use it (and when not to)

Use it when:

  • delivery feels slow and the team wants to know where the time goes
  • a release or a freeze is coming and the hazards are concrete
  • you want a forward-looking retro that fits in 30 minutes
  • the team just changed its workflow and wants to see if it helped

Speed Car or Sailboat? Both have forces for and against plus risks ahead. Speed Car is about pace on a short road: no destination, and a bridge for every hazard. Sailboat is about a goal on a longer trip, with the island in view and risks you mitigate in discussion. If the team feels overloaded rather than slow, the Hot Air Balloon asks what you could drop.

Pick something else when:

  • the problem is quality or morale, not speed. Talking about speed makes it worse; try Mad Sad Glad.
  • the slowdowns are all inside one workflow stage. A Kanban retrospective looks at flow stage by stage.
  • you need a longer view. For a whole project, use Sailboat or a timeline retrospective.

How to run it live (30 minutes)

TimeStep
0โ€“3 minReview last retro's action items
3โ€“9 minSilent writing: engine and parachute
9โ€“14 minSilent writing: hazards, then a bridge for each
14โ€“17 minGroup and dot vote
17โ€“27 minDiscuss top parachutes, then hazards and bridges
27โ€“30 minConfirm actions and owners
  1. Check last time's bridges. Open the Previous Retro tab in the Action Items panel. Did you build the bridge before the hazard arrived? Old / Unresolved Items shows older ones still open.
  2. Bring one number. Share median cycle time or deploys per week from your tracker. It makes "we were slow" specific.
  3. Engine and parachute first. Six minutes on the shared timer, with a size on each parachute (see the tip below).
  4. Hazards, then bridges. Each hazard's author adds a bridge note. If nobody has one, that hazard gets discussion time.
  5. Group and vote. Drag duplicates together, vote with three dots each, then sort by Most Votes.
  6. Decide. The top parachute gets a fix; each top hazard gets its bridge assigned.

How to run it async over a sprint

Parachutes are easy to spot: you're waiting. Note it while you wait, with how long.

  1. Day 1: the next board opens as soon as someone clicks Start New Retro after the last retro.
  2. During the sprint: any wait longer than half a day becomes a parachute note with the number of hours. Anything that saved real time becomes an engine note.
  3. Mid-sprint: the facilitator adds the hazards already on the calendar (freezes, launches, dependency upgrades) and asks for bridges.
  4. Two days before the end: everyone votes, and any hazard still without a bridge gets one.
  5. The day before: the facilitator groups notes and reads the CarrotIQ Sprint Summary for the parachute column.
  6. Retro day: a 15-minute call to assign the top bridges and the parachute fix, or a written round where each proposed owner accepts by end of day.

See how to run an async retrospective.

12 example prompts

What speeds us up

  1. What saved you the most time this sprint?
  2. Which change to how we work is already paying off?
  3. When did a story go from start to done fastest, and why?

What slows us down 4. Where did work sit waiting, and for whom? 5. Which handoff cost us the most days? 6. What do we queue for that we could do ourselves?

Hazards on the road 7. What's on the calendar that could stop a release? 8. Which dependency upgrade are we putting off? 9. What would slow us most if it went wrong next sprint?

How we get past them 10. What could we do this sprint so the hazard never hits? 11. Who outside the team do we need to talk to first? 12. What's the cheapest test that tells us if the bridge holds?

Facilitator tip and a common pitfall

Tip: size the parachutes. "Design sign-off is slow" leads to a vague discussion. "Design sign-off added 11 days across five stories" leads to a fix. Ask for hours or days on every parachute note, even rough ones.

Pitfall: cutting a parachute you need. Some parachutes are safety gear: a security review, a staged rollout, a second reviewer on payment code. When one of them tops the vote, the action is to make it faster or start it earlier, not to remove it. Ask "what would we risk without this?" before anyone proposes skipping a step.

How AI helps with this format

On Pro AI (and during the free trial), CarrotIQ handles the admin:

  • Group names. Drag "waiting on design sign-off" onto "copy approval from marketing" and CarrotIQ names the group, for example "Approval Wait Times".
  • Summaries. The Sprint Summary covers each column and the whole retro. The parachute summaries from a few sprints show whether the same waits keep coming back.
  • Suggested action items. CarrotIQ Suggest drafts an action from the notes, weighting the most-voted ones. It works well as a first draft of a bridge; edit it and assign an owner.

Example action items

Parachutes get a fix that shortens the wait; hazards get a bridge dated before the hazard.

NoteAction item
Parachute: "Design sign-off adds two to three days""Ana books two 15-minute sign-off slots a week with the designer. Kai tracks days waiting on the next five stories."
Parachute: "Schema changes wait two days for a DBA ticket""Ben agrees a same-day review lane with the DBA team for low-risk changes, like new indexes. Trial it for one sprint."
Hazard: "App store review before the holiday freeze""Lucรญa submits the iOS build on December 5, a week before the freeze, with release notes ready by December 3."
Hazard: "Partner API rate limit drops on January 1""Femi batches partner API calls and adds a retry queue this sprint, tested in staging against the new limit."
Engine: "Contract tests let us ship the API alone""Keep it. Hana adds contract tests to the checklist for every new endpoint."

The Previous Retro tab lists these at the next retro. More in retrospective action items that actually get done.

Use this template in Retro Rabbit

  1. Start a 14-day free trial. No card is needed.
  2. Pick Speed Car from the format library: choose "Browse all formats" when you create your Team Room, or later in the Team Room's Settings.
  3. Ask the team to add a parachute note, with the hours lost, every time they wait on something.

See pricing for plans.

Frequently asked questions

What is a Speed Car retrospective?

A retrospective where the team is a race car. The engine is what sped you up, the parachute is what slowed you down, hazards are dangers on the road ahead, and the bridge is how you'll get past them. It looks back at delivery speed and ahead at what could stop you.

Who created the Speed Car retrospective?

Paulo Caroli described it in July 2011 on his Agile Tips blog as the Speed Car โ€“ Abyss activity, with an engine, a parachute, an abyss and a bridge.

What's the difference between Speed Car and Sailboat?

Speed Car has no goal column; it pairs every hazard with a bridge, so the team writes its mitigations on the board. It's also shorter, at 30 minutes against Sailboat's 45. Use Speed Car for delivery speed and near-term hazards, and Sailboat when a longer goal is the point.

What goes in the parachute column?

Anything that slowed the team down this sprint: waiting for sign-offs, handoffs, queues for shared environments, slow builds. Some parachutes are there for good reason, like a security review. Those need to get faster, not disappear.

How long does a Speed Car retrospective take?

About 30 minutes if the team added notes during the sprint. Caroli's original runs 40 minutes, with the writing done in the room.

Is Speed Car the same as the speedboat retrospective?

No. Speedboat comes from Luke Hohmann's Innovation Games and focuses on anchors that hold a product back. Speed Car is a separate format with a similar idea, plus hazards ahead and the bridges to cross them.